Saturday, 3 March 2018

A Water tank for Tumbarumba


The water tank at Tumbarumba follows the standard  NSW  20,000 gallon welded design, with timber stand, concrete supports, and a water filling pipe coming directly from the bottom of the tank.  When I was there in 1980, the tank had been out of use for around 10 years, but still essentially complete.  Unfortunately, I only took one photo, so I am indebted to the pictures taken by others. Thank you Peter ('Of Branching Out NSWGR' blog fame) for supplying me some extra photos from his own collection.

The water tank, and turntable as at December 1980.  Slide photography was fairly expensive, and I took no other useful photos of the water tank.  But the tank water spout, and hose is still there

Other reference sources were the Greg Edwards Data sheet (L1) , and the Water Tank article in Australian Journal of Model Railways (issue 5)  by Graeme Henderson, and Phil Kelly

The welded tank “kit” was bought from Casula Hobbies at a recent exhibition.  This plastic casting has been available for decades, and shows a number of deficiencies.  The welded pattern at the corners is not complete, the casting is very thick,  and there is no interior detail.   Whilst I am sure that these things could be fixed,  I made the decision to cheat save some time in fabrication of parts, as well as some money.  

Each of the 4 sides of the kit were cut down to size.  I have not found a use for the pieces of the tank that I have not used in this project


  The plastic castings is designed for the larger 40,000 gallon  tank, so the top half of the castings were cut off with a fine saw, and sanded flat.  I also removed the 7 undersized plastic joists that were cast into the bottom of the tank casting.  Polystyrene glue then fixed the sides, and base together.  

A very plain interior - with ugly positioning tabs.  But what can one expect for $11.99 now-a-days

I considered making an interior, but as I was already cheating, why not fill it with water?   The tank was brush painted Tamiya German grey, and weathered with my standard rusty coloured powdered pastels
The reflection from the "non painted" surface of the clear plastic is effective.


The “water” would be a sheet of clear styrene, painted Tamiya Olive green on one side.  The olive green looks a bit like stagnant water, and something that will disguise the lack of an interior in the tank.  The styrene is installed ”shiny side up” just below the top of the tank.   I am debating whether I should also use “Gloss Medium”, available from artists supply stores to give the surface a bit more depth.  I did this on the “Yendys” exhibition layout to good effect.

Balsa piers attached to the styrene base.  Getting the piers aligned is a step not to be rushed, but these are a bit rough, even by my standards. 

The tank stand was next.  I cut out a base of styrene sheet, and made up the concrete plinths out of balsa.  These plinths are slightly undersized compared to the data sheet, but I was using what shapes I had.  The razor blade in the chopper cut the balsa square, and consistently.  After marking up the styrene base, the 16 balsa plinths were glued into position.    Floquil concrete paint then applied.  After drying, a dirt covering covered the base.

painted Floquil concrtete, and given a surface of real dirt.  Fortunately, most of the piers are hidden under the tank, so I am not too worried that they are not quite square

The uprights should be 12” scale square timbers (3.5mm).  Well, whilst I had just enough North Eastern strip wood,  I would prefer to use this where one can see the timber, not hidden in the dark underneath the tank..  The alternative was 4mm square balsa, which I bought for $1.49 per 910 mm length (2 lengths were used).   The balsa is 0.5mm too wide, but after distressing with the razor saw to add some wood grain effect, it really isn’t too far off scale.  16  uprights were cut with the chopper tool, and 11 longer lengths for the upper tank joists and beams.  All these were dunked in the staining solution, and then allowed to dry.

All 4 sub-assemblies were allowed to completely dry, before I added the first round of cross bracing.


I made up 4 sub assemblies, with 4 uprights, and a  beam across the top.  Cross bracing was then cut to size, stained, and glued in place across the uprights.  Once the glue had set, all 4 sub assemblies were attached to the stand, and locked in place with 2 joists.   Again, cross bracing was applied between the various uprights.  The remaining joists were last to be added.

Tank stand assembled.  I fitted the remaining cross bracing BEFORE I added the last 5 joists


Nut bolt and washer details (Grandt line) were added only to the outside of the tank stand only.   I am sure the size I used is not correct, but I was using what I had.  As readers may have noticed, this project is low cost.


Adding the tank on top give the feel of the finished stand.

As Tumbarumba’s tank had a water spout connected directly to the tank, this was the next step. I am unaware of any commercial products, so I made up a facsimile out of plastic sprue parts using the data sheet as a guide. 

The water spount  was originally a straight piece of scrap styrene sprue, roughly 9 scale inches in diameter..  To bend it, I carefully rotate the sprue above a candle flame, until it softens, and then bend to shape, and hold until the plastic "refreezes".  I used the data sheet for the positioning of the bends.  This technique is a good one to master.

Water pipe inlet pipe, cistern, and ladder were next  to be added.  The ladder was one from a Ratio brand signal kit ( I bought in London in 1985) , but the rest was made up from scrap sprue.  Whilst lacking the fine detail of the correct plumbing joints, I cannot argue with the price.  And I have made a guess at the positioning of the ladder, and input pipe.  None of the photos that I have shows this detail.  Finally the water spout hose was made up from paper, and painted Tamiya “Buff”. 


Just needing some ducks

I have 3 more water tanks to make – Humla, Borambola, and Wagga .  They are all slightly different, however, they will have to wait as I have started on two more structures -  station master’s accommodation at Bomen, and Ladysmith

Happy modelling

Friday, 9 February 2018

Finding a train room


QBX 004 iat Junee Roundhouse. These locos are a common visitor on the mainline south, and whilst I am not modelling modern image,, I get to see and hear them daily from my house


Building a layout often requires doing things that are outside your comfort zone.  .  Most people will probably shudder at the electrics, whilst others will stall at the benchwork, or the scenery.   In my case, to get my layout progresses requires an excursion into into 1:1 scale, and I am well out of my comfort zone.  Let me explain.



Over the last month, my progress on building HO models has slowed.  Finding time on the workbench during the hottest months of the year has been a struggle.   But I have not been idle
Regular readers of my posts may have gathered that I presently do not have a train layout.    When I bought the house in Junee in 2014, the 9 x 12 metre brick garage presented me with an opportunity, and a problem.  The opportunity was that the garage had within the approved council plans, provision for a small bathroom, and the floor drains were already installed within the garage floor slab.  This bathroom, could become a kitchenette for a granny flat, teenage retreat, man cave, or a train room.  The problems were that these floor drains did not connect anywhere, As I needed the garage for storage, particularly whilst the extensive internal house renovations proceeded, the kitchenette, and granny flat build was academic .

In the meantime, my 2003 design concept for the  Wagga and Tumbarumba branchline layout was modified to fit the new space. My original plan fitted  inside an 6 x 8 metre shed.   The “granny flat”’s  kitchenette eats into the branchline benchwork, and as a result, I now need a helix to gain elevation to the second deck.
3D cardboard concept of the layout, showing the granny flat 'void" in the bottom RHS


Now that the house is basically finished, I have turned my attention to the garage, backyard, storage, and Granny flat. 

Carport framework being installed in front of the garage in 2016.  What is not obvious from this picture, is that the driveway drain under the carport was blocked, and this area flooded after rain.  At least the carport, and the new roller doors helped keep the garage door area dry.

Well, progress on the backyard has now started.   I won’t get into the nit and gritty, but some fences were “relocated”, some ground was levelled, a woodshed moved, water lines, stormwater, and septic trenches were dug, and pipes installed.  Replacement  of the garage’s leaking downpipes, and drain problems fixed.  Paths and retaining walls are in the process of installation, and soon will follow a couple of concrete slabs for a garden shed, and the fore-mentioned woodshed.  For storage, I have identified a suitable location for a container, and this should provide a home for stuff that might one day be needed?    I am hoping these changes will free up the back half of the garage so that building the “granny flat” can commence in as few months   So, whilst the HO modelling is on hold, the goal towards a layout is progressing.

Some in progress pictures to finish.  Stay focused, and you will get there in the end.




The things one finds. The previously mentioned carport drain was exposed, and we discovered a section of pipe removed by the previous owners. Unsure why. Anyway, the plumbers fitted a new drainpipe off the garage, and a pipe junction to fix this issue.  The concrete will get replaced as part of the new paths in this area.
Digging the new septic line.  The future train room has its own doorway.
The septic, and intersected stormwater pipes from the garage share the one trench for a distance,.  The new septic tank will be installed on the other side of  the new fence separating the paddock, from the house backyard.

Digging the posts for a retaining wall behind the "machinery" shed.
Pathway formwork  from the house to the "machinery shed". is still be fitted..   This shed currently has temporary dog run pens installed. Most frustrating, is that this shed has the best view of the main south railway line.  At least being farthest away, the dog noise is reduced slightly

Wednesday, 10 January 2018

Riverboats on the Murrumbidgee

I have been asked about the paddlesteamer positioned in the picture at the end of my latest Blog post.   
Paddle steamers were once a common sight on the Murrumbidgee River in Wagga, although that was generally before the railway arrived.  According to Keith Swan’s book “A History of Wagga Wagga”,  the steamers “Corrong” and “Wagga Wagga” were employed to take railway construction material downstream to Narranderra (where the railway there was being built), and cut redgum timber back to Wagga in 1879, and 1880.  The transport of redgum sleepers from the Narranderra sawmill via the river continued  until 1914 according to Keith Swan.  Upstream activity to Mundarlo for limestone occurred occassionly.

Riverboat on the Murrumbidgee, believed at Wagga dock in the 1870s

PS Wagga Wagga at Brewery Flats, Narrandera



Wagga Wagga dock - approx 1900.  Note (In the background) Hampden Bridge was constructed in 1895, and was demolished around 2015, after being bypassed with a new bridge, and being too expensive for Wagga council to maintain. It had the largest (by area) deck per span of any timber truss bridge in Australia

A picture of a paddlesteamer on the Wagga Dock, with Hampton Bridge in the background. This is an image displayed at the Wagga Wagga Regional Museum

Another picture from the Wagga Wagga Regional museum, and a description.  Whilst snags were removed from the river for navigation, the rest of the narrative about the river is from my research, a little fanciful. Charles Sturt used a longboat in 1829 to explore the river, and I have not sighted any description of the water clarity in his diary entries 








The remains of PS Wagga can be seen during low flows of the Murrumbidgee at Narrandera

==
There is a report of the PS Albury attempting to get to Gundagai loaded with sawmill equipment for Adelong.  It ran aground on a sandbar, and was only refloated when the equipment was offloaded.  On the return trip downriver, it was loaded at Wagga with supplies, and enroute to South Australia, also picked up wool bales

"PS Albury" around 1870.  This was the first paddlesteamer said to have reached Gundagai in 1858.  Image stolen from Albury and District Historical society

The "PS Platypus" built for service on the Murrumbidgee, also made a few trips between Gundagai and Wagga in 1879

Lift bridges

Whilst there were a lot of lift spans on ther Murray, and Darling rivers, I was made aware of two on the Murrumbidgee:- Carrathool, and Hay (although I haven't found photo evidence of Hay's bridge).  There might have been one at Balranald, but again, that would be speculation.  The bridge at Carrathool is the only one remaining; no longer in use, but preserved.

Google image of the bridge dates from 2016


Plaque on the bridge, gives information on the construction.  1924 seems a bit late, as the steamer trade would been just a shadow of what it was in the late 1800s.  


Sightseeing on the Murrumbidgee

For a time, there was a commercial venture based near Eunony Bridge (east Wagga) which offered a sight seeing boat on the Murrumbidgee twice a week  Unfortunately, it was an oversided “Tinny” rather than a paddlesteamer.   Fishing boats, and canoes are still fairly common sights - boat loading ramps can be found at various locations

Image stolen from a video on Lost Wagga Wagga facebook page showing the sight seeing boat.  Suspect the blue colour of the river in the image is false - the Murrumbidgee is locally known as the "Big Muddy"



Where to find paddlesteamers?

Paddlesteamers would be rare now on the Murrumbidgee, but can still be found on the Murray River, where one can get an authentic feel.  And if Echuca is too far, then the PS Enterprise is in Canberra on Lake Burley Griffin.  So it is not too far fetched that a paddlesteamer may make it again to Wagga.

Pevensey at Echuca Dock. VR Railway shed on the Righthand side of the picture
Steaming on the Murray. Note the water colour

PS Adelaide at Echuca in the 2010 flood

I have had an interest in paddle steamers for many years. When LJ Models brought out their kits of PS Adelaide, and PS Pevensey in the 1990s, I bought both.  Instead of building the kits, I used the plans to construct versions in wood.   Both my models remain uncompleted.
My unfinished scratch built paddlesteamers, PS Pevensey, and PS Adelaide.


About 10 years later, came the sad news that Fred Gill MMR, had passed away.  Fred was very  influential in the hobby, and many of his scratch building articles and  tips in early AMRM magazines are still inspiring.  (hint: search for his name in the on-line AMRM Index)  The NMRA was asked to find homes for his models, and the lists included the PS Adelaide.  The start price was reasonable, and I was successful in my bid.  I expected it to be the LJ models kit version, so I was very surprised when it wasn’t.   The model is  is exquisite in the detail.  
Unfortunately, there was some postal damage to the wheelhouse, and the stay support post, but these were easy to fix.  

Fred Gill's, PS Adelaide - with some damage to the wheelhouse, and stay post

After repair, I thought I would see the differences.  My model is based on the LJ Models kit, and is close to the present  configuration, (which I photographed in 2010 - picture earlier in this blogpost)

After repair. There are some differences in the two models.  I do not know where Fred got his plans from, and I suspect this will remain a mystery.  The general size of the lower deck, and dimensions is quite similar.  From a technical viewpoint, how does the captain, and his dog  get into the wheelhouse, as there are no steps to get from the lower deck to the wheelhouse deck.?  




So, as my tribute to Fred, I will proudly display his model on my river.  I hope you will all allow me this indulgence.





Saturday, 6 January 2018

Murrumbidgee River bridge – part 4 – Track


Compromises are something we all have to deal with .  On a model railway, almost every decision is a choice between alternatives,  and  there is a trade-off between speed of construction, the size of the layout,  materials used, money spent, and satisfaction of the finished product.

Murrumbidgee river at low flow levels. Note the weathering effect of the river on the piers.

The Murrumbidgee River bridge is a model where I have tried to push my own modelling standards, at the expense of money spent, and time.  I am fortunate that I am not up to my armpits on actually building the layout proper at the moment, as the goal  to get trains running would have me working on other tasks.  The layout room build is still some way off. 

Even so, I am glad that my bridge model is not full length, as the construction of the shortened version  has become  a marathon.  The end is in sight.

The trackbed of the real bridge consisted of 2  metal girders running the full length of each span.  Sleepers laid across the top of these 2  girders.  The Uneek kit supplies 2 thin stripwood lengths to substitute for the lengthwise girders.  The assumption,  although not stated in the Uneek instructions, is that one will use flextrack for the bridge track.  Simple and quick.  Well, this was a compromise that I wasn’t going to take.  It looks wrong

I lacked measurements of the lengthwise girders, although my own detail photos gave a hint of the size.  I also needed to maintain the “loading gauge” clearances for locos and rolling stock, so they couldn’t be too thick.

 I checked the Greg Edwards data sheets (sheet P13) to get some ideas of the measurements on unballasted bridge decks.  The sleepers are spaced about 11mm apart for HO (just under 3 scale feet), and the sleepers are longer than sleeper length on ballasted track   Searching my supplies, I re-discovered a Campbell’s packet of 500 bridge and trestle ties, and rather than make yet another pair of metal girders, I thought the 10” square North Eastern stripwood would work.

Eight lengths of 10” square stripwood were painted grimy black to match the colour of the bridge spans.  Calculations showed just over 200 sleepers were needed.  I painted these sleepers white in batches over a few days.
Some of the timber after painting. I have decided to go with a full white sleeper, rather than just painting the tips. This may be a mistake (or own goal), but it is my layout, staining the sleepers first would have added yet more time to the project, and I am building the bridge for me.

Adding the sleepers to the span.  I found it easier to measure 88 mm (7 sleepers worth), and flue down one sleeper.  When this was dry, I would then halve the gap, etc, until 8 sleeprers were in place.

After the first base made, the spacing could be transfered to the second, third and fourth.


Fitting the sleepers to the girders is as pictured.  Make sure that everything is as square as possible.  I am using PVA glue as the adhesive.   I am also building this on a sheet of glass, to stop any twists, and bumps

The rail is stripped from Peco SL100X flex track   Yes, Code 100 – which is yet another compromise.  My experience with code 100 in the past with “12th Street Yard”, and “Yendys”  has been fairly positive, provided the rail is painted.  Removal of the shine on the sides of the rail is the key to hiding the rail height.   On the forementioned layouts, I sprayed Floquil “Roof Brown” on the track – including the sleepers, cleaned paint off the railhead, and ballasted afterwards.  Spraying the rail once it was down on my bridge isn’t possible, so the rail has to be painted   first.

Having observed handlaid track on many layouts, both in Australia and in the USA, shows that it is spiked directly to the sleeper base.  But to my eyes,  it doesn’t look right.  Something is missing?  Have you noticed?  Every wooden sleeper should have a pair of tie plates, that hold the rail in position.


The tie-plate pictured is 20 cm x 30cm in size.  In HO, this is around 2.3mm x 3.5mm.  As the peco code 100 rail track base is marginally wider than scale, I thought I would go with 2mm x 4mm.  I thought about many methods to simulate this on the sleeper.  In the end, I painted  Floquil roof brown onto white paper, sliced off a 2mm strip, and chopped the strip into 4mm lengths.    I have placed no other detail on them.  A spot of glue on the sleeper, and place the paper tie plate in roughly the right position, adjust, and wait for the glue to dry.   Hint, use the tip of a sharp knife (I used a #11 surgical scalpel blade) to spear the paper, and then move it to the glue spot.  The glue will pull the paper off the knife tip, and the knife tip can then align the paper.

Paper tieplates added to the sleepers

The track to the right has the tieplate detail, to the right without for a direct comparison. . Make up your own mind to whether this detail is worth the effort?

I thought I would see if the effect is worth the time and effort.  It is subtle, but I do like it.  What is also apparent, is that the tie plates are not consistently positioned on the sleepers.  I will have to adjust my technique in the future, as the viaduct track will not be hidden by the bridge girders. 

Rather than spiking the rail to the sleepers, I used Techgrip Polyurethane  adhesive I bought from Bunnings, and smeared it on the rail underside. With  track gauges to hold the rail at the correct gauge,  apply weight.  The glue goes off slowly, allowing fine adjustments in the first 15 minutes .  Important to try and  get the new track centered exactly over the sleepers.


Checkrails.  I have always thought that raill bridges should have checkrails, but the end view of the cut-up bridge at Wagga only shows the main running rails.  However, I was sent a picture of the Whitten truss bridge at Woolbrook, and it has checkrails.  

Woolbrook Whitton Truss bridge - single span.  the checkrails positioning does not follow the Greg Edwards Data sheet, so this pattern won't be followed

Interestingly, the rail appears to be spiked directly onto the sleepers, with no tie-plates.  This is good, as that means that the check rail will be slightly lower than my running rails, so they may not lose the paint during track cleaning.. The check rails were painted, bent to shape, and glued  between the main running rails

Attach the track base girders to the Whitton truss with adhesive.  In this case I used PVA glue.  The glue takes a few minutes to go off, which allows for adjustment, but also if I ever need to remove the bridge deck, then the glue can be pulled apart without undue damage to the bridge deck or the bridge. Again, make sure the rail is centered. This is the last chance to get this right  

The bridge deck extends onto the future viaduct.  

Fishplates are there as a aligning point, where the bridge spans meet.  I have another sleeper (not shown) to fit under the fishplate when the bridge is finally installed  on the layout

I have fitted  fishplates to the end of one bridge span, as I want to be able to separate both spans for storage.    My goal with this series of Blog Posts was  to complete the 2 main spans, and lay track.  Actual installation on the layout is in the future, as the process to create my train room out of half my garage is ongoing.  Decisions on the river depth will then be made, installation and weathering of the plaster piers, as well as the construction of some of the connected viaduct.

It was 43 degrees C outside, and a wind blowing in Junee, so I took these pictures inside. The plaster piers have been painted since the initial part 1 blogpost, and they are just holding the bridge up by gravity.  The "Adelaide" paddlesteamer was built by the late Fred Gill MMR, and whilst well out of time period, it seemed too nice a model to not use.

Some colour at the end.  Loco and carriages all fit under the overhead girder sections.  Whew!!,



Until next time,  build a model or two.  Happy modelling